Introduction:


This document explains the conversion approach/steps to convert the Local Composite Provider/ Multi Provider to HCPR composite provider.


Prerequisites:


Backend BW version has to be BW 7.4 SPS9 and above to get the conversion. 

If the version is lesser than SPS11 then pre-requisite is to apply the OSS note – 2115198 -HCPR: Corrections for conversion.

SAP suggest to use Composite provider of type HCPR as HCPR can be developed using the Studio and not the COPR. All future developments/enhancements are happening on the type HCPR.


Steps Involved:

 

Step 1: Check the system version and consider the below action if the system is lesser than SPS11.


If the system is lesser than SPS11 then apply the OSS note – 2115198 in the system which will bring the required corrections in the system.


Download the OSS Note in SNOTE:

1.PNG

Implement the note:


While implementing this this is prompt to implement note- 2115198 corrections and updating of the new program RS_UDO_NOTE_2115198 in the system which has to execute post implementing the note – 2115198.

2.PNG

Once the note is implemented, then execute the report using SE38 in the system:

3.PNG

Execute with the sequence as per the instructions below:

4.PNG

Test run gives the below message:

5.PNG

Proceed to Step 2:

6.PNG

This will prompt for modifications to be stored in the transport. 


Execute the activity as a batch job.

7.PNG

The below message appears for the job.

8.PNG

In transaction SMX, check the log of the job:

9.PNG

10.PNG

Come back to SE38 to re-run the program again with the UPDATE mode.

11.PNG

     These results with the below log:

12.PNG

If all green then the note corrections are applied. If there are any errors, then perform the execution one more time.


Goto next step:

13.PNG

This list the overall log in Green color.

 

 

Once this is done then confirms the corrections are done in SNOTE.

15.PNG

Confirm the manual actions and then mark the action as done. With this Note is completely implemented.


Step 2: Execute the conversion program in BW system to convert the existing COPR/MPRO to HCPR.


SAP has delivered a program - RSO_CONVERT_IPRO_TO_HCPR to convert the already existing Multi provider (MPRO) / Local Composite provider (COPR) to type HCPR.


Execute the program in SE38 which will bring the below view:

17.PNG

The options represents the below:

18.PNG

Note: There are multiple additional options are available in BW7.5 which allows taking a backup of the Queries or restoring the queries.


Update the fields with the source and target provider data and run the execution in simulation mode.

20.PNG

Note: As in Local Composite provider, the Navigational attributes are marked as @3 as prefix which is replaced with prefix 4 to differential the type from COPR to HCPR.


Physical Conversion: Select the mode as "Convert Infoprovider"

21.PNG


Log displays with the results and the kind of changes.


Goto RSA1 and check for the new Composite Provider:

22.PNG

Double click on the composite:

23.PNG

Check the contents to validate the data further and reconcile the results matching with the COPR type.


Conversion using the same name space:

 

34.PNG

New entry with the same name space is created and available in RSA1.

25.PNG

Option 3:

 

To convert the below composite provider and its associated BEX query.

26.PNG

Execute the program with the below options:

27.PNG

Above selection will create the HCPR with the same name but creates as a copy and overwrite is not possible.


Post execution, this will prompt to select the list of BEX to be copied:

28.PNG

Proceed further will allow us to change the new Query name:

29.PNG

Rename can be done for example like below or to the customer name space.

30.PNG

Once this is done, the program lists the log for all the changes that are being performed.


In the database there is a new BEX query which has made an entry:

31.PNG

Observation: The old Composite is in the name space of @3 as prefix. And the new composite of type HCPR is referred with the same name space the way it looks in RSA1.

You can see the Old and new Composite.

32.PNG

Difference in the Bex Level between the old to the new:

32_1.PNG
This has additional Dimensions to list the InfoProviders separately where as in the COPR this is present in the Char. Catalog itself. Navigational attribute name space is changed as below:

32_2.PNG

Validate if the Output results are the same.


Limitations:

 

Below limitations are applicable:

33.PNG

Note: Prepare the data output before and after conversion and make sure that the results are same. Depending on the results, check whether the new HCPR need to be considered to make the old one as obsolete.


In WEBI, the old BEX has to be replaced with the new BEX if the converted HCPR is considered going forward and if the BO is being used on top of BEX.